For MRK Sport Business, an On-Grid photovoltaic system was implemented to increase energy efficiency and reduce costs associated with electricity consumption. The project is part of the company’s strategy to adopt sustainable solutions and capitalize on renewable energy sources.
The system has an installed power of 173.8 kWp and is composed of 316 LONGi photovoltaic panels, each with a capacity of 550 W. The energy produced is managed through four Huawei SUN2000-50KTL-M3 inverters, which ensure efficient operation and optimal integration of the system into the existing electrical infrastructure.
The implemented solution allows the local production of the energy necessary for the company’s activities and contributes to the reduction of energy costs in the long term. At the same time, the use of renewable energy supports the beneficiary’s sustainability goals and reduces the impact on the environment.
Through this project, MRK Sport Business benefits from a modern and high-performance energy infrastructure, capable of supporting the company’s development in an efficient and responsible way in terms of resource consumption.
173.8 kWp
Installed power
316
LONGi panels
550 W
The power of each panel
4
Huawei inverters SUN2000-50KTL-M3