Installation of a photovoltaic power plant for the Târgu-Jiu Energy High School

ADREM Link has installed a photovoltaic power plant for the Târgu-Jiu Energy High School, a project dedicated to increasing energy efficiency and promoting the use of renewable energy sources within an educational institution with a technical profile.

The implemented solution consists of a photovoltaic plant with an installed power of 15 kW, equipped with 54 Trina Solar polycrystalline photovoltaic panels and Huawei inverters, recognized for their reliability and performance in operation. The system was sized to contribute to reducing electricity consumption from the grid and to support the institution’s sustainability goals.

The project was completed in a very short time, the entire installation being assembled and put into operation in just two days. By implementing this solution, the high school benefits from the production of electricity from renewable sources, reducing operating costs and familiarizing students with modern technologies used in the field of green energy.

The investment represents a concrete example of integrating sustainable technologies in the education sector and contributes to the development of a culture oriented towards energy efficiency and environmental protection. Through such projects, ADREM Link supports the transition to a cleaner and more responsible energy model, based on the use of renewable resources.

15 kW

Installed power

54

photovoltaic panels Trina Solar

2 days

for installation and PIF system

alt="Stație de încărcare pentru vehicule electrice la reprezentanța BMW Auto Cobălcescu Pitești"
Charging station for electric vehicles at the BMW Auto Cobălcescu Pitesti dealership
The increase in the number of electric vehicles and the development of sustainable mobility require the expansion of the charging infrastructure in accessible and relevant locations for users. In this context, ADREM designed and implemented for Auto Cobălcescu the infrastructure necessary to power a fast charging station for electric vehicles at the BMW dealership in Pitesti.
alt="Stații de încărcare pentru vehicule electrice – proiectare și execuție"
Charging stations for electric vehicles – design and execution
The development of electric mobility directly depends on the existence of a modern and accessible charging infrastructure. In this context, ADREM has carried out a complex project for Enel X Romania for the design and execution of charging stations for electric vehicles, contributing to the expansion of the national electromobility network and accelerating the transition to low-emission transport.
alt="Centrală fotovoltaică de 2,7 MW pentru Nurvil"
2.7 MW photovoltaic power plant for Nurvil
The development of energy production from renewable sources was the basis of the project carried out for Nurvil, consisting of the design and execution of a utility-scale photovoltaic plant with an installed capacity of 2.7 MW in Vâlcea County. The project represents an important investment in green energy infrastructure and demonstrates ADREM’s ability to deliver complex solutions for large-scale energy production.
alt="Sistem fotovoltaic de 173,8 kWp pentru MRK Sport Business"
173.8 kWp photovoltaic system for MRK Sport Business
For MRK Sport Business, an On-Grid photovoltaic system was implemented to increase energy efficiency and reduce costs associated with electricity consumption. The project is part of the company’s strategy to adopt sustainable solutions and capitalize on renewable energy sources.
alt="Sistem fotovoltaic de 110 kW pentru Auto Cobălcescu"
110 kW photovoltaic system for Auto Cobălcescu
The investment made for Auto Cobălcescu represents an important step towards reducing energy consumption and adopting sustainable solutions for carrying out operational activities. The implemented photovoltaic system was designed to capitalize on solar energy and reduce dependence on energy supplied from the public grid.
alt="Sistem fotovoltaic de 100 kW pentru Halele Centrale Obor"
100 kW photovoltaic system for Obor Central Halls
The integration of a renewable energy production solution in a building with representative historical and commercial value for Bucharest was the main objective of this project. The photovoltaic system installed at the Obor Central Halls contributes to reducing the energy consumption of the public grid and increasing the energy efficiency of one of the most well-known markets in Romania.