The development of energy production from renewable sources was the basis of the project carried out for Nurvil, consisting of the design and execution of a utility-scale photovoltaic plant with an installed capacity of 2.7 MW in Vâlcea County. The project represents an important investment in green energy infrastructure and demonstrates ADREM’s ability to deliver complex solutions for large-scale energy production.
As an EPC (Engineering, Procurement & Construction) contractor, ADREM ensured the complete implementation of the project, from the technical design and supply of equipment to the execution of the works, electrical integration, testing and commissioning of the plant. The installed solution includes 4,388 high-efficiency LONGi photovoltaic panels, with a unit power of 645 W, as well as 8 string inverters, integrated into an electrical and monitoring infrastructure designed for high performance and reliability.
The field of works included the installation of support structures, the construction of networks of direct and alternating current cables, the implementation of protection and grounding systems, outdoor lighting, perimeter security and the integration of a modern monitoring and control platform. The entire system was designed to ensure the efficient operation of the plant and maximize long-term energy production.
With an estimated production of approximately 3,800 MWh of electricity annually, the plant contributes to reducing carbon emissions and increasing the share of renewable energy in the energy mix. Through this project, Nurvil benefits from a modern and sustainable energy infrastructure, and ADREM strengthens its expertise in the development and implementation of large-scale photovoltaic projects.
2.7 MW
Installed power
4.388
photovoltaic panels LONGi
645 W
The power of each panel
3,800 MWh/year
Estimated green energy production