100 kW photovoltaic system for Obor Central Halls

The integration of a renewable energy production solution in a building with representative historical and commercial value for Bucharest was the main objective of this project. The photovoltaic system installed at the Obor Central Halls contributes to reducing the energy consumption of the public grid and increasing the energy efficiency of one of the most well-known markets in Romania.

The project included the installation of a photovoltaic system with a power of 100 kW, consisting of 244 panels with an individual power of 410 W, located on the roof of the building. The total area occupied by the system is approximately 476 square meters, and the technical configuration was adapted to the particularities of the existing structure.

The implementation involved overcoming technical challenges generated by both the specifics of the construction and the extensive routes required for the electrical infrastructure. However, the project was successfully completed, resulting in a facility capable of producing approximately 107 MWh of electricity annually.

By harnessing solar energy, Obor Central Halls benefit from reduced energy costs and a reduction in environmental impact, contributing to the development of a more sustainable operating model for one of the most important commercial destinations in the Capital.

100 kW

Installed power

244

photovoltaic panels

476 m²

Surface Covered

107 MWh/year

Estimated production

alt="Stație de încărcare pentru vehicule electrice la reprezentanța BMW Auto Cobălcescu Pitești"
Charging station for electric vehicles at the BMW Auto Cobălcescu Pitesti dealership
The increase in the number of electric vehicles and the development of sustainable mobility require the expansion of the charging infrastructure in accessible and relevant locations for users. In this context, ADREM designed and implemented for Auto Cobălcescu the infrastructure necessary to power a fast charging station for electric vehicles at the BMW dealership in Pitesti.
alt="Stații de încărcare pentru vehicule electrice – proiectare și execuție"
Charging stations for electric vehicles – design and execution
The development of electric mobility directly depends on the existence of a modern and accessible charging infrastructure. In this context, ADREM has carried out a complex project for Enel X Romania for the design and execution of charging stations for electric vehicles, contributing to the expansion of the national electromobility network and accelerating the transition to low-emission transport.
alt="Centrală fotovoltaică de 2,7 MW pentru Nurvil"
2.7 MW photovoltaic power plant for Nurvil
The development of energy production from renewable sources was the basis of the project carried out for Nurvil, consisting of the design and execution of a utility-scale photovoltaic plant with an installed capacity of 2.7 MW in Vâlcea County. The project represents an important investment in green energy infrastructure and demonstrates ADREM’s ability to deliver complex solutions for large-scale energy production.
alt="Sistem fotovoltaic de 173,8 kWp pentru MRK Sport Business"
173.8 kWp photovoltaic system for MRK Sport Business
For MRK Sport Business, an On-Grid photovoltaic system was implemented to increase energy efficiency and reduce costs associated with electricity consumption. The project is part of the company’s strategy to adopt sustainable solutions and capitalize on renewable energy sources.
alt="Sistem fotovoltaic de 110 kW pentru Auto Cobălcescu"
110 kW photovoltaic system for Auto Cobălcescu
The investment made for Auto Cobălcescu represents an important step towards reducing energy consumption and adopting sustainable solutions for carrying out operational activities. The implemented photovoltaic system was designed to capitalize on solar energy and reduce dependence on energy supplied from the public grid.
alt="Sistem fotovoltaic de 100 kW pentru Halele Centrale Obor"
100 kW photovoltaic system for Obor Central Halls
The integration of a renewable energy production solution in a building with representative historical and commercial value for Bucharest was the main objective of this project. The photovoltaic system installed at the Obor Central Halls contributes to reducing the energy consumption of the public grid and increasing the energy efficiency of one of the most well-known markets in Romania.