ADREM has carried out for SC Nimbus Com SRL the design, installation and commissioning of a photovoltaic system designed to reduce the electricity consumption of a store located in the center of Câmpulung.
Following the analysis of energy consumption and the evaluation of the existing conditions on site, a three-phase photovoltaic installation consisting of 16 photovoltaic panels, with an installed power of 6 kW, and a Huawei inverter of 10 kW was dimensioned. The system was mounted on the terrace of the building, using an aluminum structure intended for non-circulating terraces, a solution chosen to ensure both the stability of the installation and the optimal use of the available surface.
The execution of the works was carried out by a team consisting of a coordinating engineer and two specialized electricians. The coordinating engineer ensured the design and implementation of the electrical part, as well as the commissioning of the installation, while the execution team carried out the complete assembly of the system. The entire project was completed in just two days, in compliance with all occupational health and safety norms and the use of specific equipment for working at height and electrical installations.
Completed on September 29, 2022, the installation contributes to reducing the store’s electricity consumption by up to 50%, generating energy from renewable sources and reducing dependence on energy supplied from the public grid.
Through this project, the client benefits from reduced operational costs and greater energy independence, while the local community gains by increasing the share of green energy and reducing the environmental impact. The project reflects ADREM’s commitment to developing sustainable and efficient solutions in the field of renewable energy.
16
photovoltaic panels
10 kW
Huawei inverter
6 kW
Installed power
-50%
Reducing consumption