Integrated service for collection, operation and validation of measurement data for electricity and natural gas meters for DELGAZ GRID SA

For over 17 years, ADREM has been providing DELGAZ GRID SA with integrated services for the collection, operation and validation of measurement data for natural gas and electricity meters, supporting one of the largest consumption data management operations in Romania. Through this long-term partnership, the company contributes to the efficient functioning of the invoicing, regularization and consumption recording processes for end customers.

The services are dedicated to both the Mass Market and Business Market segments, covering the entire fleet of meters under the administration of Delgaz Grid. The activity is carried out in 6 counties in the Moldova region and 13 counties in northern and central Transylvania – Alba, Arad, Bistrita-Nasaud, Caraș-Severin, Cluj, Harghita, Hunedoara, Maramureș, Mureș, Sibiu, Sălaj, Satu Mare and Timiș – and serves over 3 million consumers in both regions.

Within the project, ADREM’s teams ensure the periodic collection of consumption data necessary for the regularization and billing process. For consumers in the residential segment (Mass Market), the meter readings are performed quarterly, while for customers in the Business Market segment the process is carried out monthly, according to the operational requirements of the beneficiary.

In recent years, the meter reading activity has been completed by verification and reading services, at the request of the distributor, of the smart electricity meters installed especially in the Moldova region. These activities contribute to the fulfillment of the obligations of periodic verification of the metering equipment and to ensuring the accuracy of the collected data.

Managing such a large volume of data and coordinating activities over a large geographical area requires well-defined processes, specialized resources and a high level of operational rigor. The experience gained in over 17 years of collaboration has allowed the development of an efficient working model, capable of ensuring the accuracy of the information collected and compliance with the established deadlines.

Through this project, ADREM contributes to the optimization of Delgaz Grid’s operational activities and to maintaining an essential service for over 3 million consumers. The longevity of the partnership is a confirmation of the company’s professionalism, reliability and ability to manage large-scale projects in the utilities and energy infrastructure sector.

+17 years

of readings for Delgaz Grid customers

19

Counties

+3 THOUSAND

consumers served in both regions

alt="Stație de încărcare pentru vehicule electrice la reprezentanța BMW Auto Cobălcescu Pitești"
Charging station for electric vehicles at the BMW Auto Cobălcescu Pitesti dealership
The increase in the number of electric vehicles and the development of sustainable mobility require the expansion of the charging infrastructure in accessible and relevant locations for users. In this context, ADREM designed and implemented for Auto Cobălcescu the infrastructure necessary to power a fast charging station for electric vehicles at the BMW dealership in Pitesti.
alt="Stații de încărcare pentru vehicule electrice – proiectare și execuție"
Charging stations for electric vehicles – design and execution
The development of electric mobility directly depends on the existence of a modern and accessible charging infrastructure. In this context, ADREM has carried out a complex project for Enel X Romania for the design and execution of charging stations for electric vehicles, contributing to the expansion of the national electromobility network and accelerating the transition to low-emission transport.
alt="Centrală fotovoltaică de 2,7 MW pentru Nurvil"
2.7 MW photovoltaic power plant for Nurvil
The development of energy production from renewable sources was the basis of the project carried out for Nurvil, consisting of the design and execution of a utility-scale photovoltaic plant with an installed capacity of 2.7 MW in Vâlcea County. The project represents an important investment in green energy infrastructure and demonstrates ADREM’s ability to deliver complex solutions for large-scale energy production.
alt="Sistem fotovoltaic de 173,8 kWp pentru MRK Sport Business"
173.8 kWp photovoltaic system for MRK Sport Business
For MRK Sport Business, an On-Grid photovoltaic system was implemented to increase energy efficiency and reduce costs associated with electricity consumption. The project is part of the company’s strategy to adopt sustainable solutions and capitalize on renewable energy sources.
alt="Sistem fotovoltaic de 110 kW pentru Auto Cobălcescu"
110 kW photovoltaic system for Auto Cobălcescu
The investment made for Auto Cobălcescu represents an important step towards reducing energy consumption and adopting sustainable solutions for carrying out operational activities. The implemented photovoltaic system was designed to capitalize on solar energy and reduce dependence on energy supplied from the public grid.
alt="Sistem fotovoltaic de 100 kW pentru Halele Centrale Obor"
100 kW photovoltaic system for Obor Central Halls
The integration of a renewable energy production solution in a building with representative historical and commercial value for Bucharest was the main objective of this project. The photovoltaic system installed at the Obor Central Halls contributes to reducing the energy consumption of the public grid and increasing the energy efficiency of one of the most well-known markets in Romania.