Modernization of the public lighting system in Plenița commune, Dolj county

ADREM carried out the modernization works of the public lighting system in Plenița commune, Dolj County, a project aimed at increasing energy efficiency, reducing operating costs and improving the quality of lighting for the community’s inhabitants.

The project included the replacement of the existing lighting infrastructure with a modern solution based on LED technology and the implementation of an intelligent network monitoring and control system. The works involved the dismantling of the existing lighting fixtures, the installation of 555 consoles and the installation of 555 LED lighting fixtures with powers of 30 W, 45 W and 54 W, adapted to the specific requirements of each area served. Also, all the necessary electrical connections and related works to integrate the new equipment into the existing network were made.

An important element of the investment was the implementation of the remote management and intelligent control system for public lighting. The solution allows the monitoring and management of the operation of the lighting fixtures, as well as the centralized management of the three lighting points of the commune. Through this infrastructure, the local authority benefits from a more efficient control over energy consumption and operating costs.

The LED technology used offers superior performance compared to conventional solutions, ensuring a lifespan of approximately 100,000 hours of operation, significant reduction in maintenance costs and high energy efficiency. In addition, the lighting fixtures allow the lighting level to be regulated and integrated into modern control systems, helping to optimize energy consumption and reduce environmental impact.

The project was implemented within 30 working days by a team consisting of an average of eight electricians per day and was completed on December 31, 2021. The execution of the works benefited from an efficient collaboration both with Distribuție Oltenia, for the coordination of work programs, and with the representatives of the Plenița City Hall.

Through this investment, the commune of Plenița benefits from a modern, efficient and sustainable public lighting system, capable of reducing electricity consumption, CO₂ emissions and light pollution, while offering a higher level of comfort and safety for the community.

555

LED lighting fixtures installed

3

Ignition points integrated into the remote management system

100,000 hours

lifespan of LED fixtures

30 days

for the full implementation of the project

alt="Stație de încărcare pentru vehicule electrice la reprezentanța BMW Auto Cobălcescu Pitești"
Charging station for electric vehicles at the BMW Auto Cobălcescu Pitesti dealership
The increase in the number of electric vehicles and the development of sustainable mobility require the expansion of the charging infrastructure in accessible and relevant locations for users. In this context, ADREM designed and implemented for Auto Cobălcescu the infrastructure necessary to power a fast charging station for electric vehicles at the BMW dealership in Pitesti.
alt="Stații de încărcare pentru vehicule electrice – proiectare și execuție"
Charging stations for electric vehicles – design and execution
The development of electric mobility directly depends on the existence of a modern and accessible charging infrastructure. In this context, ADREM has carried out a complex project for Enel X Romania for the design and execution of charging stations for electric vehicles, contributing to the expansion of the national electromobility network and accelerating the transition to low-emission transport.
alt="Centrală fotovoltaică de 2,7 MW pentru Nurvil"
2.7 MW photovoltaic power plant for Nurvil
The development of energy production from renewable sources was the basis of the project carried out for Nurvil, consisting of the design and execution of a utility-scale photovoltaic plant with an installed capacity of 2.7 MW in Vâlcea County. The project represents an important investment in green energy infrastructure and demonstrates ADREM’s ability to deliver complex solutions for large-scale energy production.
alt="Sistem fotovoltaic de 173,8 kWp pentru MRK Sport Business"
173.8 kWp photovoltaic system for MRK Sport Business
For MRK Sport Business, an On-Grid photovoltaic system was implemented to increase energy efficiency and reduce costs associated with electricity consumption. The project is part of the company’s strategy to adopt sustainable solutions and capitalize on renewable energy sources.
alt="Sistem fotovoltaic de 110 kW pentru Auto Cobălcescu"
110 kW photovoltaic system for Auto Cobălcescu
The investment made for Auto Cobălcescu represents an important step towards reducing energy consumption and adopting sustainable solutions for carrying out operational activities. The implemented photovoltaic system was designed to capitalize on solar energy and reduce dependence on energy supplied from the public grid.
alt="Sistem fotovoltaic de 100 kW pentru Halele Centrale Obor"
100 kW photovoltaic system for Obor Central Halls
The integration of a renewable energy production solution in a building with representative historical and commercial value for Bucharest was the main objective of this project. The photovoltaic system installed at the Obor Central Halls contributes to reducing the energy consumption of the public grid and increasing the energy efficiency of one of the most well-known markets in Romania.