Rehabilitation, modernization and streamlining of the street lighting system in the city of Corabia, Olt county

ADREM carried out the design and execution works for the modernization and efficiency of the public lighting system in the city of Corabia, Olt County, a project aimed at increasing energy efficiency, improving urban safety and reducing the operating costs of the local administration.

The project aimed to rehabilitate and modernize the existing public lighting infrastructure by fully capitalizing on the existing network and replacing the inadequate lighting fixtures with modern equipment based on LED technology. In total, 1,500 LED street lighting fixtures were installed, of which 500 fixtures with nominal powers between 50 and 70 W on the city’s main arteries and 1,000 fixtures with powers between 30 and 50 W on the secondary streets.

To increase the level of safety in risk areas, the project included the installation of 3 street lighting fixtures equipped with integrated surveillance cameras. Also, in order to enhance the urban heritage and representative public spaces, 20 RGB LED projectors were installed to illuminate the facades, monuments and important statues in the city, of which 10 recessed and 10 apparent projectors.

The works also included the modernization of the interior lighting in buildings of public interest by installing 28 LED lighting fixtures with nominal powers between 20 and 40 W, thus contributing to the reduction of energy consumption and increasing the comfort of users.

An important element of the project was the implementation of an intelligent public lighting monitoring and management system. The solution allows online control of the ignition and extinguishing cycles, monitoring of energy consumption and automatic transmission of data via GSM/GPRS to a dedicated software platform. Through this infrastructure, the local administration benefits from efficient management of the lighting system and permanent access to information on the operation and consumption of the network.

Through the implementation of this project, ADREM contributed to the modernization of the urban infrastructure of Corabia, to the reduction of electricity consumption and to the increase of the quality of public services offered to the community. The implemented solutions ensure a modern, efficient and sustainable lighting system, adapted to the current requirements of smart urban development.

+1.500

LED lighting fixtures installed

20

RGB LED floodlights for the illumination of monuments and representative buildings

3

Lighting systems with integrated surveillance cameras

100%

Reuse of existing lighting infrastructure

alt="Stație de încărcare pentru vehicule electrice la reprezentanța BMW Auto Cobălcescu Pitești"
Charging station for electric vehicles at the BMW Auto Cobălcescu Pitesti dealership
The increase in the number of electric vehicles and the development of sustainable mobility require the expansion of the charging infrastructure in accessible and relevant locations for users. In this context, ADREM designed and implemented for Auto Cobălcescu the infrastructure necessary to power a fast charging station for electric vehicles at the BMW dealership in Pitesti.
alt="Stații de încărcare pentru vehicule electrice – proiectare și execuție"
Charging stations for electric vehicles – design and execution
The development of electric mobility directly depends on the existence of a modern and accessible charging infrastructure. In this context, ADREM has carried out a complex project for Enel X Romania for the design and execution of charging stations for electric vehicles, contributing to the expansion of the national electromobility network and accelerating the transition to low-emission transport.
alt="Centrală fotovoltaică de 2,7 MW pentru Nurvil"
2.7 MW photovoltaic power plant for Nurvil
The development of energy production from renewable sources was the basis of the project carried out for Nurvil, consisting of the design and execution of a utility-scale photovoltaic plant with an installed capacity of 2.7 MW in Vâlcea County. The project represents an important investment in green energy infrastructure and demonstrates ADREM’s ability to deliver complex solutions for large-scale energy production.
alt="Sistem fotovoltaic de 173,8 kWp pentru MRK Sport Business"
173.8 kWp photovoltaic system for MRK Sport Business
For MRK Sport Business, an On-Grid photovoltaic system was implemented to increase energy efficiency and reduce costs associated with electricity consumption. The project is part of the company’s strategy to adopt sustainable solutions and capitalize on renewable energy sources.
alt="Sistem fotovoltaic de 110 kW pentru Auto Cobălcescu"
110 kW photovoltaic system for Auto Cobălcescu
The investment made for Auto Cobălcescu represents an important step towards reducing energy consumption and adopting sustainable solutions for carrying out operational activities. The implemented photovoltaic system was designed to capitalize on solar energy and reduce dependence on energy supplied from the public grid.
alt="Sistem fotovoltaic de 100 kW pentru Halele Centrale Obor"
100 kW photovoltaic system for Obor Central Halls
The integration of a renewable energy production solution in a building with representative historical and commercial value for Bucharest was the main objective of this project. The photovoltaic system installed at the Obor Central Halls contributes to reducing the energy consumption of the public grid and increasing the energy efficiency of one of the most well-known markets in Romania.